Ahli Muda Teknik Jalan (SI031018)
Jenis Skema : Okupasi
Jenjang (Level) : 7
Young Road Engineering Expert (Code : SI031018)
Unit Kompetensi:
Kode Unit : F.42ATJ00.001.2
Mengendalikan Pekerjaan Survei Pendahuluan (Reconnaissance Survey)
Controlling Reconnaissance Survey Work
Kode Unit : F.42ATJ00.002.2
Melaksanakan Pekerjaan Pengumpulan Data
Carry out data collection work
Kode Unit : F.42ATJ00.003.2
Melaksanakan Studi Kelaikan dan Lingkungan
Conduct feasibility and environmental studies
Kode Unit : F.42ATJ00.004.2
Melaksanakan Pekerjaan Perencanaan Geomtrik Jalan
Carry out road geomechanical planning work
Kode Unit : F.42ATJ00.005.2
Melaksanakan Pekerjaan rekayasa Lalu-lintas
Carry out traffic engineering work
Kode Unit : F.42ATJ00.006.2
Melaksanakan Pekerjaan Rekayasa Geoteknik
Carrying out Geotechnical Engineering Work
Kode Unit : F.42ATJ00.007.2
Melaksanakan Pekerjaan Perencanaan Perkerasan Jalan
Carry out Pavement Planning Work
Kode Unit : F.42ATJ00.008.2
Melaksanakan Pekerjaan Perencanaan Drainase
Carry out Drainage Planning Work
Kode Unit : F.42ATJ00.009.2
Melaksanakan Pekerjaan Perencanaan Dinding Penahan Tanah dan Dinding Penahan Tanah dan Dinding Pelindung Lereng
Implementing the Planning Work of Retaining Wall and Soil Retaining Wall and Slope Protection Wall
Kode Unit : F.42ATJ00.010.2
Melaksanakan Pekerjaan Perencanaan Bangunan Pelengkap Jalan
Carry out road complementary building planning work
Kode Unit : F.42ATJ00.011.2
Menyiapkan Dokumen Pengadaan
Prepare Procurement Documents
Kode Unit : F.42ATJ00.012.2
Melakukan Pelaksanaan Pekerjaan Persiapan Kontruksi Jalan
Performing Road Construction Preparation Work
Kode Unit : F.42ATJ00.013.2
Melaksanakan Kegiatan Administrasi Pelaksanaan Kontruksi Jalan
Carry out Administrative Activities for the Implementation of Road Construction
Kode Unit : F.42ATJ00.014.2
Melaksanakan Pekerjaan Drainase
Carry out Drainage Work
Kode Unit : F.42ATJ00.015.2
Melaksanakan Pekerjaan Tanah dan Geosintetik
Perform earthworks and geosynthetics
Kode Unit : F.42ATJ00.016.2
Melaksanakan Pekerjaan Perkerasan Berbutir dan Perkerasan Beton Semen
Carry out graded pavement and cement concrete pavement works
Kode Unit : F.42ATJ00.017.2
Melaksanakan Pekerjaan Perkerasan Aspal (Flexible Pavement)
Carrying out Asphalt Pavement Work (Flexible Pavement)
Kode Unit : F.42ATJ00.018.2
Melaksanakan Pekerjaan Preventif Pelaksanaan Pekerjaan Jalan
Carry out preventive work on road works
Kode Unit : F.42ATJ00.019.2
Melaksanakan Pekerjaan Struktur Jalan
Carry out Road Structure Work
Kode Unit : F.42ATJ00.020.2
Melaksanakan Pekerjaan Harian dan Pekerjaan Lain-lain
Carry out daily work and miscellaneous work
Kode Unit : F.42ATJ00.021.2
Melakukan Pengawasan Kegiatan Pekerjaan Persiapan Konstruksi Jalan
Supervising Road Construction Preparation Work Activities
Kode Unit : F.42ATJ00.022.2
Melaksanakan Kegiatan Pengawasan Administrasi Kontruksi Jalan
Carry out Road Construction Administration Supervision Activities
Kode Unit : F.42ATJ00.023.2
Melaksanakan Pengawasan Pekerjaan Drainase
Supervise Drainage Work
Kode Unit : F.42ATJ00.024.2
Mengawasi Pelaksanaan Pekerjaan Tanah dan Geosintetik
Supervise the Implementation of Earthworks and Geosynthetics
Kode Unit : F.42ATJ00.025.2
Melaksanakan Pengawasan Pekerjaan Perkerasan Berbutir dan Perkerasan Beton Semen
Supervising Graded Pavement and Cement Concrete Pavement Work
Kode Unit : F.42ATJ00.026.2
Melaksanakan Pengawasan Pekerjaan Perkerasan Aspal (Flexible Pavement)
Carry out Supervision of Asphalt Pavement Work (Flexible Pavement)
Kode Unit : F.42ATJ00.027.2
Mengawasi Pelaksanaan Pekerjaan Preventif Pekerjaan Jalan
Supervise the implementation of preventive road works
Kode Unit : F.42ATJ00.028.2
Melaksanakan Pengawasan Pekerjaan Struktur Jalan
Carry out supervision of road structure works
Kode Unit : F.42ATJ00.029.2
Mengawasi Pekerjaan Harian dan Pekerjaan lain-lain
Supervising Daily Work and Miscellaneous Work